1/17/25 13:10 EST PWE Grand Junction - Partial Outage due to a meraki switch failure. Power was verified and cycled on equipment but meraki switch failed to boot up. Router stayed online and was able to be reached by network team. Uplink was moved to SW02 and 3 ports were moved to that switch to keep site partially online with a phone, printer, and computer, as well as wifi. A new meraki switch was sent to site that should arrive 1/21/25. Once received, yard manager will reach out to move ports and uplink to the replacement switch.